CO2 & Water compression
Several subsystems contain fluid handling machinery: pumps, compressors, valves etc. These components require special care, as they are not (all) available on the scale of the plant, without modification. The current available projects are organized around the following key questions.
Key questions:
- Can we compressor CO2 to a pressure of 50 bar at low flowrates?
- Can we integrate a water compression system into the electrolyzer?
- Can we achieve the required lifetime?
- Can we remove sufficient water from the CO2 going into the compressor?
Join us!
We have projects for all backgrounds and levels (MBO, HBO, WO). Take the first step and receive personal consultation about projects that fit your background and interests.
01.
Initial contact
Every internship is different and each educational institution requires a different approach. That’s why we start with an assesment of your background to see if there could be a match. It starts with sending us some info (like your CV, starting periode, etc).
02.
Meeting(s)
After the initial assessment of the info you sent we start with the actual application stage where we plan interviews. In these interviews we discuss your application and give you additional info about ZEF and some specific assignments. If the meetings are positive we can go to the final stage.
03.
Onboarding
If it’s a match it’s time to arrange all the formalities. In this stage we make sure that you have a project description which is approved by your educational institution and we make sure that everything is ready so that you have a great start at ZEF!